In short

Iridium ICE certification is required before sale, and it covers the whole product.

A product built on an Iridium module needs Iridium Compatible Equipment (ICE) certification before it can be sold commercially. It covers the whole product, including the model, firmware, antenna, cable and intended use, not just the module. Many teams only discover this step just before production.

Why certification is required

  • The satellite network is shared: a device that transmits or behaves badly affects other users of the same system. Certification letters state that Iridium can withdraw certification at any time if the equipment has an adverse impact on the system.
  • The antenna and cable decide signal quality: a public certification letter names a specific antenna part number and even limits the cable loss between antenna and module (for example, under 0.15 dB). With the wrong antenna, a device keeps retrying and wastes power.
  • Service and use must match: the letter ties the product to an authorised service (for example SBD), a product class and a vertical market (for example IoT).
  • The partner agreement requires it: a public Iridium partner agreement states that every product, and every enhancement to a product, must be certified before commercial sale, and that sales must stop at once if certification is withdrawn.

What certification involves

Taking a public Iridium partner agreement (2012) as an example, certification includes:

  • Laboratory and live testing in the intended configuration.
  • Test calls run by the partner, with records kept and potential defects reported the same day.
  • Product documentation and training for support and sales staff.
  • Regulatory approvals in each market, with proper labelling.

Another public example: the manufacturer submitted a test plan to Iridium for approval, ran it under Iridium's oversight, and Iridium then granted certification. The actual steps, timing and cost vary with the product and the agreement.

What a certification letter states

From the public letter Iridium issued for ZOLEO:

ItemExample
Equipment name and modelZOLEO V1.5, ZL1500
Transceiver firmware versionTA21004
Authorised serviceSBD
Product classClass 2B
Authorised vertical marketIoT
Antenna part numberOne specified model
CableMaximum loss between antenna and module

Changing the antenna, cable, vertical market or module firmware can take a product outside its certification.

After certification

  • A material change to the product requires a new certification letter before sales can continue.
  • New host firmware may also need supplementary certification, including firmware delivered over the air.
  • Iridium can withdraw certification at any time if the equipment harms the system.

Why it goes through a partner

Certification letters are issued to partners under an Iridium Value-Added Reseller (VAR) agreement. Public information also shows that the bare 9704 module is supplied only to companies working closely with Iridium or its partners, and only for product development towards certification. Companies building a 9704 product usually go through this process with a partner. N3D is an authorised Iridium VAR and helps customers developing 9704 products plan and apply for ICE certification.

What to plan for during development

  • Freeze the antenna, cable, enclosure and power design early; later changes may mean retesting.
  • Certification and production both need test units and test modes, so leave room in the firmware.
  • If the same enclosure has other radios such as Bluetooth or Wi-Fi, confirm the test scope first.
  • Put certification time and cost in the schedule from day one.

ICE is not regulatory approval

Iridium's certification letters state that Iridium makes no representation about the product's quality, safety or regulatory compliance. Telecom and radio approvals in each country (for example FCC in the United States or NCC in Taiwan) are separate.

Sources
  • Letter fields, re-certification, withdrawal, no regulatory representation: Iridium's certification letter for ZOLEO V1.5 (2 July 2026, published by ZOLEO on its support site).
  • Certification before commercial sale, what certification involves, stopping sales on withdrawal: Iridium Value Added Manufacturer Agreement (2012, public filing on the US SEC EDGAR system).
  • Test plan approved and run under Iridium's oversight: SKIES, "FLYHT receives certification for use of AFIRS 228S on Iridium network" (2013).
  • Who can obtain the bare module: Ground Control, "Iridium Messaging Transport devices"; GTC, "Iridium Certus 9704 Module".

If I use a certified module, does my product still need certification?

Not necessarily exempt. Certification covers the whole product, including the antenna and cable, so it depends on how your product differs from the certified combination.

Does changing the host firmware require re-certification?

It may need supplementary certification. Check with your partner before releasing new firmware.

How long does certification take, and what does it cost?

It depends on the product; there is no public fixed timeline or fee. For small, fast projects, start with the certified RockBLOCK 9704.

All parts in this series

From developer kit to certified product: what an Iridium 9704 product needs, the limits of the developer kit, why certification matters, how to choose hardware, where it fits, and measured timing and power. Ten parts, in order, each readable on its own.

  1. What do you need to build an Iridium 9704 product?
  2. What problems does IMT CC actually solve?
  3. What are the limits of the Iridium 9704 Launch Pad?
  4. Why do 9704 products need certification, and what does it cover?
  5. Who is the RockBLOCK 9704 for?
  6. Launch Pad, N-9704, RockBLOCK 9704 or your own design: which should you choose?
  7. Where can the IMT 9704 be used? Mountain rescue, maritime and monitoring
  8. How should power be designed for the 9704?
  9. Why can an IMT message take several minutes?
  10. How does the Iridium 9704 compare with Starlink and OneWeb?

← Previous Next →

Related hardware

Updated 2026-10-27

N3D supplies satellite communication for alpine and industrial use. See services